Note: This content is accessible to all versions of every browser. However, this browser does not seem to support current Web standards, preventing the display of our site's design details.

  

Medium Term Production Scheduling of a Hydro-thermal System under Uncertainty using Nested Benders Decomposition

Author(s):

K. Nolde, M. Uhr, M. Morari
Conference/Journal:

Automatisierungstechnik, vol. 56, no. 4, pp. 189-196
Abstract:

We present a multistage stochastic programming formulation for monthly production planning of a hydro-thermal system. The formulation explicitly considers the stochasticity from variations in water reservoir inflows and electric energy demand. The problem is solved efficiently applying Nested Benders Decomposition. The solution is implemented in a model predictive control scheme. Closed loop simulation results are shown to illustrate performance of the controller. The solutions of the medium term scheduling problem can then be used as reference inputs for short term planning and lower level controllers to avoid greedy usage of reservoir water.

http://at-automatisierungstechnik.de

Year:

2008
Type of Publication:

(01)Article
Supervisor:



File Download:

Request a copy of this publication.
(Uses JavaScript)
% Autogenerated BibTeX entry
@Article { NolUhr:2008:IFA_3058,
    author={K. Nolde and M. Uhr and M. Morari},
    title={{Medium Term Production Scheduling of a Hydro-thermal System
	  under Uncertainty using Nested Benders Decomposition}},
    journal={Automatisierungstechnik},
    year={2008},
    volume={56},
    number={4},
    pages={189--196},
    month=apr,
    url={http://control.ee.ethz.ch/index.cgi?page=publications;action=details;id=3058}
}
Permanent link